Xin Liu


Office: Guanli New building 407

Email: liuxin9735@dhu.edu.cn

research interests: scheduling, logistics optimization

INTRODUCTION

Dr. Xin Liu joined Glorious Sun School of Management, Donghua University in 2020. Shie is currently a lecturer in the School of Management, Donghua University.  She received her doctoral degree majored in management science and engineering at Tongji University in 2020. Her research interests include scheduling, logistics optimization. She has published 11 SCI-indexed journal papers.

Education

  • 2015.09-2020.07  Management Science and Engineering, School of Management, Tongji University, Ph.D.

  • 2010.09-2014.06  Management Science and Engineering, School of Management, Tianjin University of Finance and Economics, B.S.

Work Experience

  • since 2020.08    Glorious Sun School of Business and Management, Donghua University, Lecturer

Honors and Awards

  • 2020  Excellent Doctoral Graduates in Shanghai

  • 2009  Excellent Doctoral Dissertations in Tongji University

ACADEMIC ACHIEVEMENTS

Journal Papers

  • Liu, M., Liu, X., Chu, F., Zheng, F., & Chu, C. (2020). Profit-oriented distributionally robust chance constrained flowshop scheduling considering credit risk. International Journal of Production Research, 58: 2527-2549.

  • Liu, X., Chu, F., Dolgui, A., Zheng, F., & Liu, M. (2020). Service-oriented bi-objective robust collection-disassembly problem with equipment selection. International Journal of Production Research, https://doi.org/10.1080/00207543.2020.1723815

  • Liu, M., Liu, X., Chu, F., Zhu, M., & Zheng, F. (2020). Liner ship bunkering and sailing speed planning with uncertain demand. Computational and Applied Mathematics, https://doi.org/10.1007/s40314-019-0994-2

  • Liu, X., Chu, F., Zheng, F., Chu, C., & Liu, M. (2020). Parallel machine scheduling with stochastic release times and processing times. International Journal of Production Research, https://doi.org/10.1080/00207543.2020.1812752

  • Wang, S., Wu, R., Chu, F., Yu, J., Liu, X. (2020). An improved formulation and efficient heuristics for the discrete parallel-machine makespan scheloc problem. Computers & Industrial Engineering, https://doi.org/10.1016/j.cie.2019.106238

  • Liu, M., Liu, X., Chu, F., Zheng, F., & Chu, C. (2020). An exact method for disassembly line balancing problem with limited distributional information. International Journal of Production Research, https://doi.org/10.1080/00207543.2019.1704092

  • Liu, M., Liu, X., Chu, F., Zheng, F., & Chu, C. (2019). Distributionally robust inventory routing problem to maximize the service level under limited budget. Transportation Research Part E, 126: 190-211.

  • Liu, M., Liu, X., Chu, F., Zheng, F., & Chu, C. (2019). Robust disassembly line balancing with ambiguous task processing times. International Journal of Production Research, 58(19): 5806-5835.

  • Liu, M., Liu, X., Zhang, E., Chu, F., & Chu, C. (2019). Scenario-based heuristic to two-stage stochastic program for the parallel machine scheloc problem. International Journal of Production Research, 57(6): 1706-1723.

  • Liu, M., Liu, X., Chu, F., Zheng, F., & Chu, C. (2019). Service-oriented robust parallel machine scheduling. International Journal of Production Research, 57(12): 3814-3830.